
CONSTRUCTION OF INTERCHANGE HUBS IN CZĘSTOCHOWA

In the context of an infrastructure initiative aimed at enhancing intermodal transport networks, the City of Częstochowa has appointed DYSTEN to execute Part 4 of the contract, involving planning, installation, and integration of Passenger Information Displays across various public transport stops.
The scope of work includes preparing detailed location plans for the dynamic passenger information displays and designing the necessary electrical connections at designated stops, installing electrical connections for the displays, installing and integrating displays into the existing system operated by MPK S.A. in Częstochowa.
The Construction of Interchange Hubs
The project-related works title is “Design and Execution of Works for the Construction of Interchange Hubs,” which consists of four key phases, includes:
- Construction of the Fieldorfa-Nila / Gombrowicza interchange hub, including the redevelopment of the cycling and pedestrian pathways along the Niemen Promenade;
- Construction of the Plac Rady Europy interchange hub;
- Construction of the Przyjemna – Gościnna interchange hub;
- Design and installation of Passenger Information Displays – awarded to DYSTEN.
The project is scheduled for completion in September 2027.